{"id":141,"date":"2017-12-19T18:32:47","date_gmt":"2017-12-19T18:32:47","guid":{"rendered":"http:\/\/www.dairysoft.dk\/?page_id=141"},"modified":"2018-01-03T06:03:23","modified_gmt":"2018-01-03T06:03:23","slug":"mads-tranum-nielsen","status":"publish","type":"page","link":"http:\/\/www.dairysoft.dk\/?page_id=141","title":{"rendered":"Mads Tranum Nielsen"},"content":{"rendered":"<p><strong>Mads Tranum Nielsen<br \/>\n<\/strong>20 years of services in dairy design, technology and commissioning.<\/p>\n<p>Assignments:<\/p>\n<p>2017: Almarai, Saudi Arabia<\/p>\n<p>-Commissioning and service assignments on CPP1 and CPP2<br \/>\n-Commissioning off complete New Re-combined process Feta line. PHE, homogenizer, Flex mixer, AMF storage, Mixing and Storage tanks, Flip flop tank system for Salt and GDL dosing, all the way to Primodan and\/or Repack fillers.<\/p>\n<p>-Re-locating Liquiverter, and start up on new products.<br \/>\n-New dosing line from Frozen cream tank to existing cream PHE.<\/p>\n<p>2016: Almarai, Saudi Arabia<\/p>\n<p>-Commissioning and service assignments on CPP1 and CPP2<br \/>\n-Commissioning off new Gista (breakfast cream) line on P6.<br \/>\n-Commissioning off New Juice recovery system.<br \/>\n-Re-building hot water system on existing UHT plant.<br \/>\n-Commissioning off New BFC (breakfast cream tank)<\/p>\n<p>Danya, Saudi Arabia<\/p>\n<p>-Designing and installation off Salt and GDL unit for Feta cheese.<br \/>\n-Commissioning and start up off Salt and GDL unit.<br \/>\n-Test on product to Tetra filling machine.<\/p>\n<p>Al Rawabi, Dubai<\/p>\n<p>-Re-location and commissioning off Brix Master for juice.<\/p>\n<p>Al Safi, Saudi Arabia<br \/>\n-Service visit regarding separator issues.<\/p>\n<p>2015: Almarai, Saudi Arabia<br \/>\n-Commissioning of New P4 Tubular Heat Exchanger, separator, de-aerator, homogenizer, etc., etc.<br \/>\n-Commissioning of new Fruit Pure Cooker.<br \/>\n-Commissioning and service assignments on CPP1 and CPP2<\/p>\n<p>Danya, Saudi Arabia<\/p>\n<p>-Commissioning of New Process Cheese Plant, SSHE, Homogenizer for 1000Kg. of process cheese.<br \/>\n-Commissioning of creaming tanks for triangle process cheese.<\/p>\n<p>Al Mansur, Egypt<\/p>\n<p>-Trouble shooting on UHT plant, with bacteriological un-sterility.<br \/>\n-Crack test on PHE (water\/product)<br \/>\n-Completely dismantling off UHT plant to check for un-sterility.<br \/>\n-Check on PHE and holding cell for pre-pasteurised milk to UHT plant.<\/p>\n<p>Barakat, Dubai<\/p>\n<p>-Commissioning off new Juice mixing tanks, Tubular cooler for juice and a new single shot CIP plant.<\/p>\n<p>2014: Almarai, Saudi Arabia<br \/>\n-Commissioning and service assignments on CPP1 and CPP2<br \/>\n-Commissioning of Tekfa dosing system for Salt and GDL (Feta Cheese)<br \/>\n-Optimising of the RCC plant, to get a better and more flexible CIP routine<\/p>\n<p>Danya, Saudi Arabia<br \/>\n-Design and installation support for 5 new Fermenting tanks, new CIP Plant, Butter Melter and rebuilding of existing mixing tanks.<br \/>\n-Commissioning of the above-mentioned equipment.<\/p>\n<p>KDC, Kuwait<\/p>\n<p>-Trouble shooting on UHT plant, where the milk got diluted.<\/p>\n<p>Tine, Norway<br \/>\n-Re-commissioning off 5 central CIP plants<br \/>\n-Re-commissioning off CIP routes, tanks, lines, PHE, separators etc., etc.<\/p>\n<p>2013: Almarai, Saudi Arabia<br \/>\n-Commissioning and service assignments on CPP1 and CPP2<br \/>\n-Commissioning of new PHE 8<\/p>\n<p>Danya, Saudi Arabia<br \/>\n-Commissioning of New Process Cheese Plant, SSHE, Homogenizer for 3000Kg. of process cheese.<\/p>\n<p>Akureyri, Island<br \/>\n-F.D. (functional descriptions) for New chees tanks and starter culture line.<\/p>\n<p>2012: Almarai, Saudi Arabia<br \/>\n-Commissioning and service assignments on CPP1 and CPP2<br \/>\n-Commissioning of new PHE 50.000L\/H<br \/>\n-Service assignment at other APV customers across Saudi Arabia, Nadec,<\/p>\n<p>Al Safi and Najdiyah.<\/p>\n<p>KDD, Kuwait (Kuwait Danish Dairy)<br \/>\n-Commissioning of New 18 line CIP plant.<br \/>\n-Commissioning and support of new ice cream plant.<\/p>\n<p>2011: Almarai, Saudi Arabia<br \/>\n-Commissioning and service assignments on CPP1 and CPP2<br \/>\n-Service assignment at other APV customers across Saudi Arabia.<\/p>\n<p>Colun, Chile:<br \/>\n-Commissioning off 4 central CIP plants.<br \/>\n-Commissioning off CIP on all process equipment.<br \/>\n-F.D. (functional descriptions) for New salt\/brine mixing tanks, cheese stacking system, and brine vats.<br \/>\n-Commissioning off energy recovering water system.<br \/>\n-Commissioning off fine (curd) separators (sieves)<\/p>\n<p>2010: Almarai, Saudi Arabia<br \/>\n-Commissioning and service assignments on CPP1 and CPP2<br \/>\n-Commissioning Sterile AIR system for Laban fermentation tanks CPP1.<br \/>\n-Commissioning of AMF dosing system.<br \/>\n-Commissioning New Flex Mixer for Feta production<\/p>\n<p>Najdiyah, Saudi Arabia<br \/>\n-Service and troubleshooting on old UHT plant.<\/p>\n<p>Al Safi, Saudi Arabia<br \/>\n-Service support on PHE and Westfalia Separators.<\/p>\n<p>Mar. 2009 \u2013 end 2009:<br \/>\nAlmarai, Saudi Arabia<br \/>\n-Commissioning of New central CIP plant for Laban fermentation area.<br \/>\n-I.O. check and commissioning of 6 new Laban fermentation tanks.<br \/>\n-Commissioning of New Cream tanks CPP2<\/p>\n<p>Jan. 2009 &#8211; Mar.2009<br \/>\nARLA FOODS, KRUS\u00c5, DENMARK.<br \/>\n&#8211; Commissioning of the whey treatment plant.<br \/>\n&#8211; Commissioning of whey PHE and Westfalia separator\/clarifier.<br \/>\n&#8211; Training personnel in daily running of the plant.<\/p>\n<p>Mar. 2008 &#8211; Oct. 2008:<br \/>\nNam Yang, milk treatment plant, South Korea<br \/>\nA green field project, producing flavored UHT milk products.<\/p>\n<p>COMMISSIONING\/SITE MANAGER<\/p>\n<p>&#8211; Commissioning of 2 central CIP plant and all CIP on process equipment<br \/>\n&#8211; Commissioning planning and start up of the process equipment.<br \/>\n&#8211; Supervising &amp; managing commissioning.<br \/>\n&#8211; Training personnel in daily running of the plant.<br \/>\n&#8211; Finalizing &amp; handing over the project.<\/p>\n<p>May. 2007 &#8211; Dec. 2007:<br \/>\nMlekPol, Cheese plant, Poland<br \/>\n&#8211; I\/O test on equipment.<br \/>\n&#8211; Commissioning of the 12 line central CIP plant and all CIP on process equipment.<br \/>\n&#8211; Commissioning of 4 milk Pasteurizers for cheese production.<br \/>\n&#8211; Commissioning of the whey treatment plant.<br \/>\n&#8211; Commissioning of 2 Westfalia separators and clarifiers for whey treatment.<br \/>\n&#8211; Training personnel in daily running of the plant.<\/p>\n<p>Feb. 2007:<br \/>\nOstrowia, Cheese plant, Poland<br \/>\n&#8211; I\/O test on equipment.<br \/>\n&#8211; Commissioning of the central CIP plant.<\/p>\n<p>Nov. 2006 &#8211; May. 2007:<br \/>\nKarat, Cottage Cheese plant, Moscow Russia<\/p>\n<p>COMMISSIONING MANAGER<br \/>\n&#8211; I\/O test on equipment.<br \/>\n&#8211; Commissioning of the central CIP plant and all CIP on process equipment.<br \/>\n&#8211; Commissioning of Cheese milk PHE and Westfalia separator.<br \/>\n&#8211; Commissioning of Cream PHE.<br \/>\n&#8211; Commissioning culture production.<br \/>\n&#8211; Commissioning Bepex Equipment: Whey Drainer, Washer &amp; Cooler and Creamer<br \/>\n&#8211; Training personnel in daily running of the plant.<br \/>\n&#8211; Finalizing &amp; handing over the project.<\/p>\n<p>Aug. 2006 &#8211; Oct. 2006:<br \/>\nFamous Brands, sauce factory, South Africa<br \/>\n&#8211; Functional descriptions.<br \/>\n&#8211; I\/O test on equipment.<br \/>\n&#8211; Commissioning of Tubular Heater for sauces.<br \/>\n&#8211; Commissioning all CIP on process equipment.<br \/>\n&#8211; Training personnel in daily running of the factory.<\/p>\n<p>Feb. 2006 &#8211; Jul. 2006:<br \/>\nWHEYCO, (HUMANA &amp; NORDMILCH), ALTENTREPTOW, GERMANY.<br \/>\n&#8211; Functional descriptions.<br \/>\n&#8211; I\/O test on equipment.<br \/>\n&#8211; Commissioning of the central CIP plant and all CIP on process equipment.<\/p>\n<p>Dec. 2005 &#8211; Feb. 2006:<br \/>\nDominant, Cheddar Cheese Dairy, Rostov, Russia<br \/>\n&#8211; I\/O test on equipment.<br \/>\n&#8211; Commissioning of the central CIP plant and all CIP on process equipment.<br \/>\n&#8211; Commissioning of Cheese milk PHE and Westfalia separator.<\/p>\n<p>Mar. 2005 &#8211; Sep. 2005:<br \/>\nSDC Milk, Geo Chang, South Korea.<br \/>\nA green field project, producing flavored UHT milk products.<br \/>\n&#8211; Process descriptions.<br \/>\n&#8211; Functional descriptions.<br \/>\n&#8211; I\/O test on equipment.<br \/>\n&#8211; Commissioning planning and start up of the 4 CIP plants and all CIP on process equipment.<br \/>\n&#8211; Training personnel in daily running of the plant.<\/p>\n<p>May. 2004 &#8211; Dec 2004:<br \/>\nAgroFerm, Lysine plant, Esbjerg, Denmark<br \/>\n&#8211; I\/O test on equipment.<br \/>\n&#8211; Commissioning of the central CIP plant and all CIP on process equipment.<br \/>\n&#8211; Commissioning on Fermentation process equipment.<\/p>\n<p>Mar. 2004:<br \/>\nFrikom\/Ledo, Icecream, Belgrad, Serbia.<br \/>\n&#8211; I\/O test on equipment.<br \/>\n&#8211; Commissioning of the central CIP plant and all CIP on process equipment.<\/p>\n<p>Oct. 2003 &#8211; Nov. 2003:<br \/>\nValio, Yoghurt plant, Oulu, Finland<br \/>\n&#8211; Commissioning of Youghurt milk PHE and Alfa, separator.<br \/>\n&#8211; Commissioning of Cream PHE.<br \/>\n&#8211; Commissioning of VFN unit (Evaporator)<\/p>\n<p>Mar. 2003 &#8211; Jul. 2003:<br \/>\nCampina International, Stupino, Russia. Long shelf life, yoghurt.<br \/>\n&#8211; I\/O test on equipment.<br \/>\n&#8211; Commissioning of the central CIP plant and all CIP on process equipment.<\/p>\n<p>Jul. 2002 &#8211; Dec. 2002:<\/p>\n<p>Al Ain Dairy Factory, United Arab Emirates<br \/>\n&#8211; I\/O test on equipment.<br \/>\n&#8211; Commissioning of the central CIP plant and all CIP on process equipment.<br \/>\n&#8211; Commissioning of the yoghurt process plant.<br \/>\n&#8211; Commissioning culture production.<br \/>\n&#8211; Commissioning of the juice process plant.<\/p>\n<p>Jun. 2002:<br \/>\nAlmarai, Milk, juice and deserts processing plant, Saudi Arabia.<br \/>\n&#8211; Service visit.<\/p>\n<p>May. 2002:<br \/>\nNestle, Navanakorn, evaporated milk, Thailand.<br \/>\n&#8211; Service visit.<\/p>\n<p>Jul. 2001 &#8211; Feb. 2002:<br \/>\nKhampang Phet, Brewery, Thailand.<br \/>\n&#8211; I\/O test on equipment.<br \/>\n&#8211; Commissioning of the 5 central CIP plants and all CIP on process equipment.<\/p>\n<p>Feb. 2001 &#8211; Jun. 2001:<\/p>\n<p>Nestle, Navanakorn, evaporated milk, Thailand.<br \/>\n&#8211; I\/O test on equipment.<br \/>\n&#8211; Commissioning of the 2 central CIP plants and all CIP on process equipment.<br \/>\n&#8211; Training personnel in daily running of the plant.<\/p>\n<p>Jun. 2000 &#8211; Dec. 2000:<br \/>\nSAB, Brewery, Port Elisabeth, South Africa.<br \/>\n&#8211; Functional descriptions.<br \/>\n&#8211; I\/O test on equipment.<br \/>\n&#8211; Commissioning of the 2 central CIP plants and all CIP on process equipment.<br \/>\n&#8211; Training personnel in daily running of the plant.<\/p>\n<p>Jan. 2000 &#8211; May. 2000:<br \/>\nKhabarowsk, Baby Food Plant, Russia<br \/>\n&#8211; I\/O test on equipment.<br \/>\n&#8211; Commissioning of the central CIP plant and all CIP on process equipment.<br \/>\n&#8211; Training personnel in daily running of the plant.<\/p>\n<p>Sep. 1999 &#8211; Nov. 1999:<\/p>\n<p>Arla Foods, Toulov, Denmark. Greenfield plant producing Cheese.<br \/>\n&#8211; Commissioning of 2 central CIP plants and all CIP on Cheese and brining equipment.<br \/>\n&#8211; Training personnel in daily running of the plant.<\/p>\n<p>Jun. 1999 &#8211; Aug. 1999:<br \/>\nDukat\/Lura, Yoghurt plant, Zagreb, Croatia.<br \/>\n&#8211; Functional descriptions.<br \/>\n&#8211; I\/O test on equipment.<br \/>\n&#8211; Commissioning and start up of the 12 line CIP plant.<br \/>\n&#8211; Commissioning all CIP on process equipment.<br \/>\n&#8211; Training personnel in daily running of the plant.<br \/>\n&#8211; Finalizing &amp; handing over the project.<\/p>\n<p>Mar. 1999 &#8211; Jun. 1999:<br \/>\nMasterlone, Cheese plant, Argentina.<br \/>\n&#8211; Functional descriptions.<br \/>\n&#8211; Commissioning of 2 central CIP plants and all CIP on Cheese and brining equipment.<br \/>\n&#8211; Training personnel in daily running of the plant.<\/p>\n<p>Apr. 1998 &#8211; Jun. 1998:<br \/>\nMao Ammerland Milchwerke, Ammerland, Germany.<br \/>\n&#8211; Commissioning of the central CIP plant and all CIP on Cheese and brining equipment.<\/p>\n<p>Feb. 1997 &#8211; Dec. 1997:<br \/>\nI.D.E.C Iran<br \/>\n&#8211; Commissioning of 2 UF Feta Cheese plants.<br \/>\n&#8211; Commissioning of 4 traditional Feta Cheese plants.<br \/>\n&#8211; Training personnel in daily running of the plants.<br \/>\n&#8211; Finalizing &amp; handing over the projects.<\/p>\n<p>Mar. 1996 &#8211; Dec. 1996:<br \/>\nAlmarai, Milk, juice and deserts processing plant, Saudi Arabia.<br \/>\n&#8211; Commissioning of 1 central CIP plant and all CIP on process equipment.<br \/>\n&#8211; Commissioning of the Laban process plant.<br \/>\n&#8211; Commissioning 2 culture production plants.<\/p>\n<p>1989 \u2013 1996:<br \/>\nFrisko Ice Cream, Aarhus ,Denmark.<\/p>\n<p>&#8211; 1 year of processing ice cream on RIA equipment.<br \/>\n&#8211; 6 years in mixing plant.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mads Tranum Nielsen 20 years of services in dairy design, technology and commissioning. Assignments: 2017: Almarai, Saudi Arabia -Commissioning and service assignments on CPP1 and CPP2 -Commissioning off complete New&#8230; <a href=\"http:\/\/www.dairysoft.dk\/?page_id=141\">Read more &raquo;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":92,"menu_order":1,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_oct_exclude_from_cache":false},"_links":{"self":[{"href":"http:\/\/www.dairysoft.dk\/index.php?rest_route=\/wp\/v2\/pages\/141"}],"collection":[{"href":"http:\/\/www.dairysoft.dk\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/www.dairysoft.dk\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/www.dairysoft.dk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.dairysoft.dk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=141"}],"version-history":[{"count":4,"href":"http:\/\/www.dairysoft.dk\/index.php?rest_route=\/wp\/v2\/pages\/141\/revisions"}],"predecessor-version":[{"id":193,"href":"http:\/\/www.dairysoft.dk\/index.php?rest_route=\/wp\/v2\/pages\/141\/revisions\/193"}],"up":[{"embeddable":true,"href":"http:\/\/www.dairysoft.dk\/index.php?rest_route=\/wp\/v2\/pages\/92"}],"wp:attachment":[{"href":"http:\/\/www.dairysoft.dk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=141"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}